Skip to content
softgoza
Storage totes on a roller conveyor between warehouse racks and a packing bench

Warehouse Automation: Where to Start

When orders miss the truck cutoff, trace the time from the first pick until the goods are ready to load. Find the longest queue, then test the system against the hourly workload before cutoff: order lines to pick or orders to pack.

Warehouse automation uses software and equipment to store, pick or move goods. A storage crane can put away a full pallet and retrieve it when needed. For piece picking, a conveyor can bring totes to a workstation where an operator picks the item and quantity on the order. Start with an order that missed its truck. If the items were picked on time but the tote waited at packing, compare its arrival time with the time packing began.

Trace an Order That Missed Its Truck

Choose one late order and note when it had to be ready to load. Look up its release time, the first and last picks, and the tote’s arrival at the packing bench. Keep the time packing started, the time the carton was sealed and the time it was ready to load as three separate events. That lets you distinguish queue time from labeling or shipment consolidation after sealing.

From the Last Pick to Ready to Load

  1. Last pick confirmed2 min in transit
  2. Tote arrives at packing16 min in queue
  3. Packing starts4 min to pack
  4. Carton sealed

Ready-to-load cutoff 14:35 · Ready at 14:38 · 3 minutes late

In this example, 22 minutes elapsed between the last pick and sealing: 2 minutes to move the tote, 16 waiting at the bench and 4 packing. Labeling took another 6 minutes. Check other orders on the same truck run. If several totes waited at the same bench, was the operator packing an earlier order, or was the bench idle for lack of cartons or order details? That distinction matters before you speed up the conveyor.

Match the System to the Queue

Measure the work at the point where it backs up: pallets put away, totes delivered or order lines picked correctly and confirmed. Give each supplier the same orders and test period. If a supplier quotes totes per hour but your cutoff depends on completed picks, record both tote arrivals and completed lines during the same trial.

What you seeWhat to recordWhat to test
Pallets waiting for storageInbound and outbound pallet counts in the same hour, plus the dimensions, weight and condition of the pallets you use.Run putaway and retrieval on the automated storage and retrieval system (AS/RS) in the proportions your warehouse actually handles. Count the inbound queue at the start and end, and the pallets that arrive during the trial. Record completed putaways separately from pallets delivered to the outbound point.
Pickers spend time walkingWalking routes and time per order, lines per order, units per line and how often pick locations need replenishment.Run the same orders through the current process and a goods-to-person station that brings totes to the picker. Compare correct, confirmed lines per hour. Record time spent waiting for totes or replenishment.
Totes queue between stationsTravel distances, crossings and how many totes the receiving station can accept throughout the shift.Compare a fixed conveyor and an automated transport vehicle on your layout. Pause the receiving station for the same period in both trials. Where do totes wait? When the station reopens, count the waiting totes and time how long it takes for the last of those totes to arrive.
Orders back up at packingOrders at the bench but unfinished at the start, including those already being packed, plus new arrivals and orders finished during the same period.Use a realistic mix of simple and multi-carton orders. Count unfinished orders at cutoff. While the queue grows, record whether the operator is busy packing an earlier order or waiting for cartons or information.

Two Checks for a Supplier Demo

Carton passing a scanning arch on a roller conveyor
Carton barcode readerThe reader sits over the conveyor. Try one carton whose code can be read and one whose code cannot. For the first, check that the carton reaches the destination on its work order. For the second, ask where it waits and who fixes the label. After reintroducing it, open that carton’s history: it should reach the right destination with just one completed delivery.
Goods-to-person workstation with tote presentation openings
Tote picking stationUse an order with several item codes that requires more than one tote. Time the run from the first tote’s arrival until the operator confirms the last line. Record time spent waiting for the next tote separately. At the end, check the picked item codes and quantities against the order as well as the time taken.

Calculate the Pick Rate You Need

Suppose the afternoon run requires 900 order lines. After setting aside time for packing and loading, you have three hours to pick. One line here means one item code on one order: three units of the same item on that order still count as one line.

Target Across All Stations

300 lines/hour

Divide 900 lines by 3 hours. All stations together must average 300 lines per hour. Check when orders arrive, too: an order released late has less time left before the same cutoff.

One Hour, Two Stations

240 lines/hour

In this trial, both stations start together. The clock runs for a full hour, including waits for totes, replenishment and confirmation. The stations finish 240 correct, confirmed lines between them.

The measured rate is 60 lines per hour below target. If the two stations sustain 240 lines per hour for all three hours, they will finish 720 of the 900 lines, leaving 180 when picking time runs out. Find the longest wait and repeat the trial with the same orders before adding another station.

At packing, count orders, including those waiting and those already being packed when the period starts. Add the orders that arrive and subtract the orders finished during that same period. If more orders remain at the end than at the start, investigate the packing queue before adding pick stations.

Agree on Acceptance Tests Before Buying

Ask the supplier to open one test order in the warehouse management system (WMS). Locate its release time, confirmed pick quantity and outstanding work. If there is a separate warehouse control system (WCS), follow the equipment job reference back to that same order. Agree which system holds the inventory balance and who investigates if a pick confirmation fails to arrive.

Test a Five-Unit Order

Order five units of one item. Choose a test location holding exactly four units, both on the shelf and in the system, with all four available to pick. Once the operator confirms those four units, check that the order history shows four units picked there and the location balance is zero. Ask where the fifth unit will come from or whether it is waiting for replenishment. Identify who owns that open task and where the buyer can follow its status.

Ask for separate prices for equipment, software, integration, training and support after handover. That makes it clear what each quote covers.

Set down the test orders, when the clock starts and stops, and the pass criteria. If the earlier target fits your operation, one criterion is at least 900 correct, confirmed lines across all stations in three continuous hours, including waits for totes and replenishment. Keep the confirmation report and log errors and downtime. If the system falls short, agree what needs fixing, who will do it and when to repeat the test with the same orders and timing rules.

Questions Before You Invest

Do we need to automate the whole warehouse at once?

You can start at one point. In the example, the tote traveled for 2 minutes but waited 16 minutes at packing. Check several orders from the same truck run to find out why the queue builds, then choose a trial that addresses the cause. Compare tote waiting times and the share of orders ready to load by cutoff against a run with a similar workload before the change.

Can we get a quote from daily order volume alone?

Daily volume can support a rough estimate. For comparable quotes, give each supplier the same data for your busiest run: pick lines, order arrival times and the time available before packing. For each order, include the number of distinct SKUs and the total number of units. Also give the dimensions and weights of the totes or pallets to be moved.

Can we keep our current WMS?

You may be able to keep it if it can exchange work with the equipment and track completion. Ask your WMS team and the supplier to run one order. Match item codes, units and status in both systems. Resend the same pick confirmation and check the history: the pick and stock deduction should each appear only once. Use that result when comparing integration and replacement costs.

How can we estimate payback before investing?

Compare the current operation and the proposed system at the same volume and dispatch schedule. Separate equipment, installation and integration costs from annual software and support fees. For overtime savings, multiply the hours you expect to save by the overtime rate you actually pay. Subtract additional yearly running costs from the estimated annual savings. If the result is positive, divide the upfront investment by that net annual saving to estimate payback in years. After installation, check actual savings and the percentage of orders ready to load on time.